Select a Country or Region

2
2

Swimming pool climbing wall project

  • We are an experienced climbing wall solution provider from China, The main business including wall designing, installation and climbing gear supplying.
  • There are many walls we has built for both domestic and oversea, any projects or partnership proposals are highly welcomed.
  • Our company provided the rock climbing wall which can be installed beside the swimming pool.
  • For swimmer body training and have fun.
Share to

Swimming pool climbing wall project

 

Project details:

We are an experienced climbing wall solution provider from China, The main business including wall designing, installation and climbing gear supplying.

There are many walls we has built for both domestic and oversea, any projects or partnership proposals are highly welcomed.

Our company provided the rock climbing wall which can be installed beside the swimming pool.

For swimmer body training and have fun.

Also can be used for swimming pool sports competition.

Swimming pool 10m/20m long.

Use with waterproof wall panel and GRP holds.

Steel structure back side.

Climbing wall panel material: GRP

Thickness: 5mm

Wall panel size: 2*1m, cut based on designs.

Panel curve shape customized.

Swimming pool climbing wall components :

1.Various rock climbing panels   

The artificial climbing wall is assembled from hundreds of rock slabs less than 1 square meter. The rock slabs can be assembled into slopes of different climbing difficulty, such as the various rock conditions that can be seen in nature, such as the protruding wall, eaves, and straight wall, and fixed on the bracket to create various spatial shapes.     

2.Rock wall support    

The rock wall bracket is the main structure of the climbing wall, divided into independent structure and supporting structure. Generally use steel structure.   

3.Rock climbing holds

The rock climbing fulcrum is an important part of the rock climbing wall. The materials and craftsmanship are similar to those of rock slabs. They have different shapes, simulations and cartoons. They are fixed on the rock slab by stainless steel bolts, which are the grip points of both hands when climbing. And the landing point of the feet.

FAQ:

Q1. What's your payment term ?

Re: Our normal payment term is 30% as deposit, balance before loading by T/T. For large order, we could discuss. 

Q2:  What’s the warranty for the project?

Re: Usually we would note the warranty for 1year. While the life expectancy could be longer time under good maintenance. 

Q3: What is your delivery time?

Re: It is based on the quantity your order. But normally, our production time is 7-15 working days.